Hi.
I'm trying to integrate Test Complete with Visual studio 2015 to run Tests as part of Team build. Follwing the article as mentioned in the link https://support.smartbear.com/viewarticle/72495.
Following the steps as mentioned I'm getting the error unable to initialize test complete. The requested operation requires elevation.
Regards
sridhar